Sequencing and Scheduling in Coil Coating with Shuttles
Zitatschlüssel Report-001-2009
Autor Höhn, Wiebke and König, Felix G. and Lübbecke, Marco E. and Möhring, Rolf H.
Jahr 2009
Nummer 001
Notiz Published in Management Science 2011
Institution Technische Universität Berlin, Institut für Mathematik
Zusammenfassung We consider a complex planning problem in integrated steel production. A sequence of coils of sheet m et al. needs to be color coated in consecutive stages. Different coil geometries and changes of coatings may necessitate time-consuming setup work. In most coating stages one can choose between two parallel color tanks in order to reduce setup times. As a complicating consequence, setup times for a coil may depend on the whole sequence of predecessors. A production plan comprises the sequencing of coils, and the scheduling of color tanks and setup work. The aim is to minimize the makespan for a given set of coils. We present an optimization model for this integrated sequencing and scheduling problem. A core component is a graph theoretical model for scheduling. It is instrumental for building a fast heuristic which is embedded into a genetic algorithm to solve the sequencing problem. The quality of our solutions is evaluated via an integer program based on a combinatorial relaxation, showing that our solutions are within $10$\% of the optimum. Our algorithm is implemented at Salzgitter Flachstahl GmbH, a major German steel producer. This has led to an average reduction in makespan by over $13$\% and has greatly exceeded expectations.
Link zur Publikation Download Bibtex Eintrag